Security window film bid specifications: a scope template for comparable proposals

A product-neutral outline for writing the request itself, so every installer prices the same openings, product, attachment and closeout.

By Shore Tint & More editorial team · · 9 min read

Key takeaways

  • Write the request before you collect bids; comparing bids is a separate step.
  • Name the objective and product documents; ask each bidder to state the exact product and document revision.
  • Attachment is a line item per opening group. For 3M films, IPA is required for approved break-and-entry applications.
  • Ask for tested configuration evidence that matches your glass; don't accept blanket minutes or compliance claims.
  • Handle the opening schedule through your officials' approved disclosure process.

How to use this template

This page helps you write a request. The companion proposal comparison guide helps you evaluate what comes back. Fill in each section below in your own document, attach a confidential opening schedule, and send the same package to every bidder. Your organization's purchasing rules govern how bids are solicited and awarded; this template doesn't replace them.

Build the opening schedule with the project brief tool, which works in your browser and doesn't send anything to this site. Your browser’s print command gives a paper copy of this template.

The scope template

Bid scope fields: fill in, then ask each bidder to respond to every row
SectionWhat to write or askResponsible party
1. ObjectiveOne sentence, e.g. help keep broken glass in place at group A doors. State what is out of scope.Owner
2. Opening schedule (confidential)Group openings by type; size, count, glass type if known, frame material. Issue through your approved disclosure process.Owner, verified by bidder
3. Glass and frame suitabilityBidder to confirm glass type and condition and note openings that are unsuitable or need further review.Bidder
4. Proposed productExact product name, manufacturer and document revision for each group; substitutions only with written approval.Bidder
5. AttachmentMethod and edges attached per group; for 3M films, whether 3M IPA is included where 3M requires it.Bidder
6. Test configuration evidenceManufacturer documents for the tested configuration that matches the glass proposed; state differences.Bidder
7. Protection, access and preparationFurniture moves, lifts, existing film removal, work-area separation, cleanup.Bidder, with owner constraints
8. Schedule and cureWork hours, phases, cure time before the attachment is relied upon, return visits.Bidder and owner
9. WarrantyWho issues it, what it covers, registration steps and conditions; supply the written terms.Bidder
10. ExclusionsEverything not included: glass replacement, frame repair, after-hours premiums, permits.Bidder
11. Submittals and closeoutData sheets with revisions, attachment record per group, care instructions, warranty registration.Bidder
12. Purchasing rulesYour quote or bid procedure, insurance certificates, payment terms, deadlines for questions.Owner

Why the exact product and revision matter

Product claims live in specific documents that are revised. A bid that says "8 mil security film" can't be checked; a bid that names the product and its current technical data sheet or specification revision can. Ask each bidder to attach those documents. For 3M films, the current documents are listed on our resources page, and the systems page explains how the products differ by purpose. The live 3M S2400 product page is an example of a manufacturer listing to check against the data sheet.

Want a measured opening schedule to bid from?

An assessment records glass, frames and sizes so every bidder prices the same scope.

Request an assessment →

Attachment and what claims to accept

3M's January 2025 security film installation guidelines require 3M IPA sealant for windstorm, break-and-entry and explosion-mitigation applications if the selected film is approved for that application, and for spontaneous breakage on single-pane tempered glass. The same document says the films are not bulletproof and not designed to stop intruders. So a bid for a break-and-entry objective using 3M film should show IPA for the openings involved, or explain in writing why not.

Accept only claims tied to a document: the product, the tested glass and the configuration. Reject blanket delay minutes, "meets code" or ballistic statements that aren't backed by a test of the specific assembly. Ballistic-rated systems are a separate category; see security film vs. ballistic glazing. The attachment guide explains why edges belong in the scope.

Manufacturer demonstrationPublished by 3M Films on YouTube, November 18, 2024. Watch on YouTube.A manufacturer demonstration for context. It is not a test of your openings, an installation certification or a guaranteed delay time; the written product and installation documents govern what a bid should include.

Sample questions to include

  1. Which openings, if any, do you consider unsuitable, and why?
  2. What product and document revision do you propose for each group?
  3. Which edges are attached, with what product, for each group?
  4. How long must attachment cure before it is relied on, and what does the site need to avoid during that time?
  5. Which manufacturer test configuration matches our glass, and how does ours differ?
  6. Who issues the warranty, and what must we do to keep it valid?
  7. What will you hand over at closeout?

Handling the opening schedule

Have the responsible purchasing and security officials decide how the opening schedule is issued and disclosed, consistent with your procurement and records obligations. Separate confidential technical details from the public request through that approved process, and describe locations in internal codes, not "unmonitored side door." Request an assessment from Shore if you want a measured schedule prepared on site.

Sources

These guides began as AI-assisted drafts from the Shore Tint & More editorial team. Our guides explain product documentation and practical project planning. Manufacturer test claims are linked, and site-specific recommendations require an assessment. Spotted an error? Contact us for corrections.